About Me

My photo
I make toys for kids who don't want to grow up. I'm on the lookout for new projects. If you're interested in commissioning me to build something ridiculous, shoot me an email.
Showing posts with label "Shawn Thorsson". Show all posts
Showing posts with label "Shawn Thorsson". Show all posts

Monday, October 31, 2011

Halo Spartan Armor Photo of the Month


Tea For One

Photo: Melissa Howell
Props and Costume: Shawn Thorsson
Model: Shawn Thorsson

Sunday, October 2, 2011

Work in Progress: Grenade Throwing Combat Garden Gnome

I've been getting around to sculpting this guy for a while. The roughed-out version has been sitting unfinished on the shelf for a couple of weeks, so the other night I locked myself in a room and refused to come out until it was presentable.

By 0430 (in the morning) he looked like so:
Combat Garden Gnome with Grenade

I'm definitely happy with this little guy:
Grenade Gnome Face Details

You may have a bullet with his name on it, but he's got a grenade addressed "to whom it may concern."

Now all he needs is a bit more smoothing and detailing, then I'll start making the molds.  As usual, I'll be selling these in my Etsy shop: www.etsy.com/shop/thorssoli

He also needs a bit more back story.  Any suggestions?

.

Friday, September 23, 2011

Pepakura Model Building

Yesterday afternoon, Matt and I sat down and did a quick build of one of the arms for our ongoing Space Marine armor project. I decided it would be a good idea to set up a camera and catch the magic in time-lapse. Check it out:



This is a small part of one of four major builds I've got going right now. Stay tuned...


.

Friday, July 8, 2011

Heart of Gold Repair Update

As I've mentioned in a previous post, I took my boat down to Svendsen's Boat Works in Alameda for some mast and rigging repairs after a disagreement with a drawbridge operator about exactly how open the bridge actually was.

So a little while ago I went down to check on the boat and found her like so:
Mainmast Missing

For a moment I couldn't think of what exactly was amiss. Then I realized that the mainmast had in fact been removed. A little walking around the yard and I found it lying on some sawhorses. This is the first time I'd gotten a close look at the broken end where the masthead used to be welded on:
Broken Masthead Welds

About a foot below that you can see where the bridge girder hit and scarred the aluminum a bit:
Bridge Scars

Looking down along the length of the mast, it also looks (to my untrained eye) as though there's a bend in the mast right where the lower spreaders are attached:
Mast Bend

Other than that, some of the screws that held the spreaders in place look to have been pulled loose:
Spreader Bracket Damage

I'm still waiting to hear from the insurance company and Svendsen's rigging shop as to whether they can save the mast and make it serviceable again or if it needs to be replaced altogether. We'll see.

Meanwhile, as I mentioned in another post, the boat tried to sink last week. It seems that my trip motoring all along the length of the bay was enough to wear down the flax packing in the shaft log (the seal where the propeller shaft passes through the hull of the boat) and it was leaking by significantly. This shouldn't have been a problem but, for reasons unknown, the bilge pump decided to take a vacation at about the same time. So after a couple of weeks of sitting at the dock without incident, the engine room filled with enough water that it completely submerged the engine. Blast!

After they'd pumped the water out, the good folks at the boatyard sent me a bunch of terrifying pictures of the oily funk that now covered everything in the engine room.
Engine funk

That afternoon I ran down to Alameda and tightened down the packing gland to prevent it happening again.

Last night I shanghaied my friend Matt and we went down to troubleshoot the bilge pump. The problem with troubleshooting the bilge pump on my boat is that it's situated at the deepest darkest part of the bilge, below the prop shaft. The only way to reach it is through this hole:
Bilge Pump fixing 2

More precisely, the only way to reach it is to lay face down on the deck, slide into the hole head first, thread your body past the two stainless steel steering cables, lean against the raw fiberglass of the hull, and stretch as far as you can in order to just barely catch the top of the bilge pump housing with your fingernails, then hold onto it as if for dear life while you shimmy and shake and swear and suffer and slowly back your way out of the hole. All the while, the steering cables digging into your left armpit.

Matt didn't get a picture of me halfway in the hole, but he did get this shot of me in between a couple of forays down below:
Bilge Pump fixing 1

Once I'd pulled the pump out (losing a hose clamp and a basket strainer into the bilge that I'd have to go back for in the process) I pulled it apart to see what was the matter. For all my poking around, it looked to be in good order. Holding it to the battery terminals, the pump functioned perfectly. Clearly the flaw was elsewhere.

Working my way back up the system, I found the problem. There, just under the deckplates in easy reach and ready view, were a pair of crimp connections that were badly corroded. Once I'd replaced the crimp fittings, everything ran perfectly. So in essence I'd spent two hours risking cuts and scrapes and the structural integrity of my spinal column in the deepest darkest dirtiest part of the boat when all I had to do what cut a couple pairs of wires and reattach them. Shit.

The coolest part though is the pair of bruises I got that match the steering cables I was laying on:
Bilge Pump fixing 3

Awesome!

Stay tuned for more...

Tuesday, May 24, 2011

A Metric Butt-Ton of Pictures from Maker Faire 2011: Part One

I'm still collecting pictures from friends and family from this past weekend, but I figured I might as well go ahead and post a few of my favorites so far.


Here I am stacking things up to be loaded into the truck:
Helmet Totem Pole


Here I am with some of my crew on Sunday afternoon in front of the booth:
Me and the Crew


Lots more after the jump.  Click "read more" to see them.

Goofy Project #5049 is COMPLETE! Pictures Galore!

When last I posted about this project, it was the end of a very long day and we all needed a break:
Spartan Built


Unfortunately, no break was about to come.  Instead, I was going to be so busy building things that I haven't had a chance to update my blog until right just now.


The good thing is that I have still been able to take pictures.  Lots of pictures.  The only problem is that the last half of last week have turned into one great big blur and I'm only vaguely aware of what pictures are supposed to be in which order.  I apologize if this entry leads to a bit of confusion, but I'm doing my best to keep it straight...


Here's yet another shot of the workshop disaster unfolding.  By this time I'd managed to put a base color coat on all of the rifles and pistols as well as Alex's stunt double (which we'd started calling "smart Alex" and/or "Winston," not sure why):
Workshop Mess
Since some of the masking on the black parts of the Marine helmets had failed, I had Mallory go back through and clean up the edges on the black parts:
Painting Helmets


She was quite proud of her work:
Mallory's Helmet Lineup


Still, later on we'd ended up piling more of the project on top of it:
Workbench Pileup

Since Smart Alex had no functional feet, I had to build a pipe and wood frame arrangement to hold him upright.  Then I inserted the whole arrangement into his ankle holes and filled his legs with expanding foam.  Here's Mallory about to be glued to his right shin as the black pigmented foam started to overflow from the ankle:
Foam Filling Legs


After peeling her hand off of the dummy, she set to work putting the base colors on all of the vacformed panels:
vacformed panels


I guess it was about that same time that Matt started cutting out components of the radar mast:
Matt Drilling


Adding a salvaged rotisserie motor, some PVC pipe, and a handful of random scraps and trinkets from the workshop, it finally started to look like something:
Antenna Building


As the crew started fading away, the last person I had helping me that night was Trevor.  The last thing to do before losing consciousness was to coat the insides of the display racks with aluminum-colored paint for better reflectivity.  Somewhere in the middle of this process, we noticed that an earwig had met his demise while trying to crawl across the wet paint:
Earwig Sacrifice


The dead earwig ended up giving us cause to pause.  We pondered whether this counted as a blood sacrifice to the Project Gods or if perhaps we would offend them with such a lowly offering.  Then we marveled at the aesthetic beauty of the shimmering metallic trail he'd left in the paint as he made his final voyage.  Then we started talking about how well preserved his little body would be, trapped for eternity in oil-based enamel.  An entomological time capsule to be discovered millenia from now by hyper-intelligent earwig archaeologists.  We wondered what they would think of him.  What could have driven this wayward character to such an end?  What desperation could possibly lead this poor, paint-besotten soul to try to cross this vast ocean of poison?


About twenty minutes into this conversation we realized that we were both pretty low on sleep and high on paint fumes.  It was time to call it a night.  I think that was Thursday night.  Maybe Friday morning?  Hell, maybe Wednesday afternoon...


I don't know.  Really.


I do know that despite the fact that I was wearing rubber gloves most of the time, I still managed to paint, stain, and cut my hands like nobody's business:
Damaged Hand


At some point in the last couple of days of the build, some of the crew started making progress on rough trimming the marine armor:
Armor Trimming


My friend Breana also spent quite a few hours hanging out and cutting out some of the parts:
Breana Trimming


Here's a shot of me explaining how the chest armor would come together:
Test Fitting Armor


Here's Trevor doing some fine trimming and installing some of the straps:
Trevor Trimming Armor


I'm not sure exactly when it happened, but somewhere along the way, I'd finished painting and weathering Smart Alex as well as building him a mostly vacformed rifle.  He looked pretty damned good:
Spartan Done


I also started doing some detail painting on some of the helmets:
Helmet Painting


Noble Six Details


Scarred Marine Helmet


Full Metal Jacket UNSC Helmet


I'm absolutely certain that that was Wednesday night.  That night I went to my boat and slept the sleep of the dead for about four hours.  Then, just like every day since I got back from Japan, I awoke wide awake for no reason at all at around 6am.


Matt had taken some vacation time to help me set up shop and deliver the pieces of this build to their destination in San Mateo on Thursday morning.  He was running pretty late though, so I took advantage of the delay to finish the assembly of the display racks.  Here they are with the insides painted silvery:
Rack Building


Here's the frosted sheet inserts laid in place:
Rack Building 2


On a whim I threw on some striped tape:
Rack Building 3


Then I cut some shelving rails to the right length to fit over the seams:
Trimming Rails


Once I'd screwed them all into place, Matt showed up and we loaded the first truckload of stuff and headed to San Mateo.  When we got there, we found out that we'd been allotted quite a bit more space than I had planned on.  When we got there, our area looked like so:
Booth Space


By the time we were done with it, it looked like so:
Blank booth


When we got back to the workshop, folks had begun trickling in to help with the final details:
Detail Painting


Somewhere late on Thursday night, my sister Sheryl arrived to add some much needed mirth to the workshop:
Sheryl Happy


Since nobody had ever actually worn it, I had her try on the hard-to-fit parts of the black suit.  It turns out that my random guess was actually a pretty decent fit:
Butt hole


I also had her test-fit some of the marine gear:
Sheryl Armor Fitting

The next morning we made the last big push to get things together.  At this point half of the costumes weren't even built and there were still three truckloads of stuff that needed to make the drive to San Mateo, so it was amazing that we'd all managed to maintain our sense of humor. 

I have Rose and Sheryl to thank for that:Vamping up the Armor Strapping

At 2:30 in the afternoon, it was time to call it quits.  Many things were still undone, but if we were going to get everything on station, and ready to go, the parts that weren't finished would have to be good enough.  That's when we piled everything into vehicles and headed out.

Here's the pile of helmets in the backseat of the big green truck:
Helmet Pile

Once we'd arrived at the site, the traffic made it clear that we were in the right place:
Arriving


Friday afternoon and evening were spent dressing up the booth:
Dressing the Booth

Everybody lent a hand putting together the last details:
Booth Dressing

Sheryl set up the comms gear for me:
Comms Check

I had worried about how it would all come together, but at this point things were really shaping up:
Booth Setup

The next morning marked the beginning of the 2011 Maker Faire.  At this point I had all of my support troops geared up and ready to go:
Marines and an ODST

But the real stars of my show were the armored Spartans:
Shuffling Slowly

Even the guy on the roof:
Spartan on the Roof

I'll be posting oodles and gobs of pictures from the weekend as well as detailed build writeups about the Marine costumes and the guy on the roof very soon.

Stay tuned...